STACKING PLAN

ELEVATED OFFICES &
GREATER SPACE

Flexible, contemporary office easily adapts to the changing needs of today’s workforce, enabling businesses to thrive.

Roof
Office High Zone – L16 to L28

View Floor Plan

 

Office Low Zone – L3 to L15

View Floor Plan

 

L7 – Legal Firm
L6 – Fitness & Wellness
L5 – Medical & Wellness
L4 – Health & Wellness
Retail – L1 to L2
SPECIFICATIONS
STRUCTURE Raft foundation with reinforced concrete structure.
WALLS a. External Walls: Concrete and/or Masonry walls and/or Pre-cast and/ or Aluminium & Glazing Wall cladding.
b. Internal Walls: Concrete and/or masonry and/or partition wall.
ROOF Reinforced concrete flat roof with waterproofing system with or without insulation.
CEILING All ceiling with skim coat unless otherwise stated. Ceiling board with painted finishesto corridors, main lobby and lift lobby.
FINISHES a. Wall: Masonry and/or dry partition wall plastered and paint. Imported tiles to washroom, lift lobby and corridors. Plastered and paint to basement wall.
b. Floor: Cement rendered finishes to all units unless otherwise stated. Imported tilesto washroom, lift lobby and corridors. Epoxy paint finish to basement carparkand driveway.
WINDOWS Window and/or Casement Window with Aluminum frame (where applicable).
Double Glazed glass and/or Double Glazed Safety glass (where applicable).
DOORS Glass and/or timber doors and PSB’s approved fire-rated doors where applicable.
IRONMONGERY Imported good quality ironmongery.
SANITARY FITTINGS Imported good quality sanitary wares, fittings and accessories
(To applicable units only).
ELECTRICAL INSTALLATION 415V three phase isolator for office units.
AIR-CONDITIONING SYSTEM AND MECHANICAL VENTILATION Individual Air-conditioning system provided. Air-conditioning system provided to all lobbies and corridors. Mechanical Ventilation will be provided if required.
LIFTS Lift to all floors.
TELECOMMUNICATION SERVICES Provision of Cable network. Each unit will be provided with the telephone
block terminal.
LIGHTNING PROTECTION Lightning Protection System shall be provided in accordance with SingaporeStandard 555: 2010.
WATERPROOFING Office Units: Waterproofing to unit washrooms.
Common Areas: Waterproofing to common Toilets, Pantry, Bin Centre and Reinforced Concrete Roof.
DRIVEWAY Stone paving to designated 1st Storey areas of driveway.
SECURITY SYSTEM Card Access control system to selected locations Proximity transponder for vehicular entry at entrances CCTV, surveillance cameras at strategic locations.
FLOOR LOADING The maximum allowable floor loading for Office Units is: 4.0kN/m2.